Engineering support

Industrial valve selection support for EPC and project buyers

Start with the service conditions, then confirm valve construction, materials, standards, testing and documents.

01

Define the service

Medium, pressure, temperature, line size, duty cycle and installation constraints determine the usable valve range.

02

Confirm the construction

Compare body style, seat or trim, end connection, actuation, fire-safe or fugitive-emission requirements and maintenance access.

03

Freeze the project records

The approved datasheet, drawing, ITP and document index control the final quotation and manufacturing release.

Nachweisliste für Beschaffer

Vor dem Angebot zu bestätigen

  • ✓ Valve type and service duty
  • ✓ Size and pressure class
  • ✓ Body, trim and seat materials
  • ✓ End connection and face-to-face
  • ✓ Actuation and accessories
  • ✓ Testing, inspection and document index

Engineering-Auswahltool

Ventilfamilie vor der RFQ eingrenzen

Use the guide as a starting point. Final selection remains subject to the project datasheet, approved standards, operating conditions and inspection plan.

Ausgangspunkt: Kugelhahn

Pipeline isolation, DBB and project-configured quarter-turn service.

Engineering deliverables across the RFQ → shipment lifecycle
Table description
Documents and engineering checkpoints SMD provides from RFQ receipt to shipment. Project-specific items are added to the ITP; baseline items below are standard.
ParameterValueUnitStandard
RFQ stageDatasheet, material selection, BOM, indicative weight, commercial offer5 items—
Engineering stageDetailed drawing, FEA on request, torque calculation, gasket schedule4 itemsProject ITP
Procurement stageMaterial certificates, sub-vendor list, sub-vendor audit report on request3 itemsEN 10204
Manufacturing stageWPS / PQR / WPQ, dimensional reports, NDE records, PMI results4 itemsASME IX / EN 10204
Testing stageHydro / pneumatic charts, low-emission certificate, fire-safe certificate on request3 itemsAPI 598 / FCI 70-2 / API 607
Shipment stageFCR, packing list, commercial invoice, CO, fumigation, photo set6 itemsIncoterms 2020