琚╄鑺睉瑜樿璋㈡钖柂瑜樻硠 娉昏阿閭攲閭柂 閿岃姊板睉鎳堣灞?娉昏阿閭瑜嬮偑
SMD Valves 璺?20+ 璋㈡瑜?OEM

琚╄鑺睉瑜樿璋㈡钖柂瑜樻硠 娉昏阿閭攲閭柂 閿岃姊板睉鎳堣灞?娉昏阿閭瑜嬮偑

灏忔瑜夎鎳堣鎳堣鎳堣鑺儊閭柂瑜?API 6D / API 607 / CE / PED / ISO 9001. 琚氳阿鑺枩閭阿瑜滆柂瑜樻硠 閿岄偑瑜夎钖瑜?鑳?钖瑜庤姊拌皭閭煿鑺儊鑺硠, 瑜忔噲灞戞噲瑜旀瑜嬫郴鑺硠, 瑜濊柂姊拌璋愭瑜屾噲瑜旀瑜嬫郴鑺硠 鎳?鑳佽姱鍐欒柂鑺硠 瑜嬭姊拌閭.

琚ч偑灞?鍐欒姱鑳佹瑜夎瑜炶 EPCs 鎳?鍐欐噲瑜嬭瑜夋噲鏂滆瑜炶鑺瑜?
灏忔瑜夎鎳堣鎳堟郴閭瑜?娉婚偑瑜旀瑜嬭鑳侀偑

琚ч偑灞?鍐欒姱鑳佹瑜夎瑜炶 EPCs 鎳?鍐欐噲瑜嬭瑜夋噲鏂滆瑜炶鑺瑜?

琚ч偑鍐欐鍗歌柂瑜樻 瑜嬫瑜夎鎳堣鎳堟郴閭瑜?娉婚偑瑜旀瑜嬭鑳侀偑 閿岃鑺睉瑜樿璋㈡钖柂鑺硠 閭灞戦偑瑜岃瑜夎

琚偑锜硅閭枩鑺娉婚偑 钖瑜嬭閭柂鍐欓偑瑜夎钖瑜?娉昏阿閭攲閭柂鑺儊 (OEM/ODM)
琚偑锜硅閭枩鑺娉婚偑 钖瑜嬭閭柂鍐欓偑瑜夎钖瑜?娉昏阿閭攲閭柂鑺儊 (OEM/ODM)

琚偑锜硅閭枩鑺娉婚偑 钖瑜嬭閭柂鍐欓偑瑜夎钖瑜?娉昏阿閭攲閭柂鑺儊 (OEM/ODM)

琚﹁ 閿岃姱灞戣姱璋愰偑姊板睉 灞戞噲瑜夎姱鑳佽灞?鏂滆姊拌柂鍐欓偑灞?娉昏阿閭攲閭柂鑺儊 鎳?鍐欐噲瑜嬭瑜夋噲鏂滆瑜炶鑺閭睉 閿岃姊拌儊瑜夐偑瑜屾噲瑜岃 鎳堣 瑜屾瑜忚柂鎳堣姊拌娉绘噲姊?閿岄偑瑜嬮攲鑺瑜岄偑 鑳?鑳佽瑜嬭姱娉昏姱閿岃鑺噲锜硅儊鑺啓鎳堣姊拌阿瑜滆柂瑜嶈 閿岃鑺啓瑜嶆郴瑜戞噲瑜?

1980s
Industrial valve manufacturing heritage
700,000+
Square feet of manufacturing facilities
300+
Employees supporting production and export
Global
Engineering and distribution network

Project readiness

Start with the project requirement

Send the operating conditions and document list. SMD Valves reviews the selected valve construction, manufacturing scope and quotation inputs before release.

01

Valve duty

Share valve type, size, pressure class, medium, temperature and operating duty for the initial technical review.

02

Engineering definition

Include the data sheet, drawing, end connection, actuation and applicable design standard where available.

03

Inspection & documents

State required ITP points, material certificates, NDT, witness requirements and manufacturing record expectations.

04

Project configuration

Define nameplates, marking, coating, packaging and any project-specific document or release requirements.

Manufacturing & quality preview

From identified material to tested valve

Real workshop and inspection images show the production chain without turning the homepage into a full quality manual.

Incoming material & traceability

STEP 01

Incoming material & traceability

Heat-number and material-document review before machining.

CNC machining & process control

STEP 02

CNC machining & process control

Dedicated machining areas support repeatable dimensions and controlled work flow.

Inspection & pressure testing

STEP 03

Inspection & pressure testing

PMI, dimensional checks and pressure tests are applied according to the agreed ITP.

Production evidence

Completed valve lots on the shop floor

These are production and final-inspection images. They are intentionally not presented as shipment records without packing or loading evidence.

Trunnion ball valves prepared for final release at SMD Valves before final release
Trunnion ball valves prepared for final release
Large-bore ball valve lot at SMD Valves before final release
Large-bore ball valve lot
Control valve production lot at SMD Valves before final release
Control valve production lot
Stainless valve production lot at SMD Valves before final release
Stainless valve production lot

Technical resources

Documents that support supplier evaluation

Catalogs are directly downloadable. Certificate copies, inspection records and project-specific documents are supplied against a defined requirement.

EPC & OEM FAQ

Clear answers for supplier qualification

These answers state the information SMD Valves can review or provide against an approved product and project scope.

View all engineering FAQs

Request the current certificate copy, scope page, issuing body and validity information before supplier approval or order award. A certificate name on a website is not a substitute for validating the current document and product scope.

Project enquiry

Send the valve type, size, class, material, quantity and service conditions.

Email [email protected] or submit your data sheet through the RFQ page.